Bournemouth Pier Structural Works

Bournemouth Christchurch and Poole Council · compiled

Tender information last checkedLast checked 29 Sept 2026, 21:12.

Opportunity overview

The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn’t affordable then Option A. Suppliers can bid to any or all of the 3 options.

Classification

  • CPV45220000 — Engineering works and construction works
  • CPV45000000 — Construction work

Lots

  • The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn’t affordable then Option A. Suppliers can bid to any or all of the 3 options Additional information: Please do not contact any officer/team named on this notice or the documentation. All documentation for this opportunity is available on www.supplyingthesouthwest.org.uk . Any expressions of interest must be made through this portal unless otherwise instructed. You will need to register on the site to submit a bid. Registering is free of charge.Value not stated
  • The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn’t affordable then Option A. Suppliers can bid to any or all of the 3 options. Additional information: Please do not contact any officer/team named on this notice or the documentation. All documentation for this opportunity is available on www.supplyingthesouthwest.org.uk . Any expressions of interest must be made through this portal unless otherwise instructed. You will need to register on the site to submit a bid. Registering is free of charge.Value not stated
  • The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn’t affordable then Option A. Suppliers can bid to any or all of the 3 options.Value not stated

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
DN755872
Status
active
Has Recurrence
No
Review Details
In accordance with Regulation 86 (notices of decisions to award a contract), Regulation 87 (standstill period) and Regulations 91 (enforcement of duties through the Court) of the Public Contracts Regulations 2015 (as amended).
Procurement Method
open
Main Procurement Category
works
Procurement Method Details
Open procedure

Bid Opening

Date
28 Feb 2025, 14:00
Description
All tenders are electronically sealed within the system and released after the deadline by the Council’s authorised officer(s).

Legal basis

Id
32014L0024
Scheme
CELEX

Lot Details

Maximum Lots Bid Per Supplier
9,999,999

Expected award period

Starts
28 Feb 2025, 14:00

Tender Period

Ends
28 Feb 2025, 14:00

Contract terms

Performance Terms
Please note that if a bid is received from a consortium or from two suppliers then words will be added to the contract to enable suppliers to be held liable for performance individually or jointly (joint and several liability).

Classification

Id
45220000
Scheme
CPV
Description
Engineering works and construction works

Submission terms

Languages

en

Submission Method

electronicSubmission

Selection criteria

Criteria

Criterion 1
Type
suitability
Description
Refer to procurement documents.

Applies To

supplier

Lots and requirements

Entry 1
Id
A
Status
active
Has Options
No
Has Renewal
No
Description
The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn’t affordable then Option A. Suppliers can bid to any or all of the 3 options Additional information: Please do not contact any officer/team named on this notice or the documentation. All documentation for this opportunity is available on www.supplyingthesouthwest.org.uk . Any expressions of interest must be made through this portal unless otherwise instructed. You will need to register on the site to submit a bid. Registering is free of charge.

Award criteria

Criteria

Criterion 1
Name
Quality
Type
quality
Description
40
Criterion 2
Type
price
Description
60

Contract period

Ends
31 Dec 2026, 23:59
Starts
1 May 2025, 00:00

Submission terms

Variant Policy
notAllowed
Entry 2
Id
B
Status
active
Has Options
No
Has Renewal
No
Description
The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn’t affordable then Option A. Suppliers can bid to any or all of the 3 options. Additional information: Please do not contact any officer/team named on this notice or the documentation. All documentation for this opportunity is available on www.supplyingthesouthwest.org.uk . Any expressions of interest must be made through this portal unless otherwise instructed. You will need to register on the site to submit a bid. Registering is free of charge.

Award criteria

Criteria

Criterion 1
Name
Quality
Type
quality
Description
40
Criterion 2
Type
price
Description
60

Contract period

Ends
31 Dec 2026, 23:59
Starts
1 May 2025, 00:00

Submission terms

Variant Policy
notAllowed
Entry 3
Id
C
Status
active
Has Options
No
Has Renewal
No
Description
The structural works are to extend the life of the pier by at least 25 years. The scope includes undertaking concrete repairs, installing Impressed Current Cathodic Protection (ICCP) system and removal of timber landing stages. Due to budget constraints, the Council are considering 3 options, these being: - • Option A: All Concrete Works Only Concrete works only. No removal of any of the timber landing stages. • Option B: All Concrete Works and Part Timber Landing Stage Removal Concrete works and the complete removal of the Northern and Small Boat timber landing stages only. • Option C: All Concrete Works and All Timber Landing Stage Removal Concrete works and complete removal of all of the timber landing stages All works will be covered by a single NEC4 ECC Option A contract (incorporating a Bill of Quantities for concrete repair works). The Councils preferred option is Option C, if affordable. If this is not achievable, then the Council will consider Option B and if that isn’t affordable then Option A. Suppliers can bid to any or all of the 3 options.

Award criteria

Criteria

Criterion 1
Name
Quality
Type
quality
Description
40
Criterion 2
Type
price
Description
60

Contract period

Ends
31 Dec 2026, 23:59
Starts
1 May 2025, 00:00

Submission terms

Variant Policy
notAllowed

Items and delivery

Item 1
Id
A
Related Lot
A

Delivery locations

Entry 1
Region
UKK24

Additional Classifications

Entry 1
Id
45000000
Scheme
CPV
Description
Construction work
Item 2
Id
B
Related Lot
B

Delivery locations

Entry 1
Region
UKK24

Additional Classifications

Entry 1
Id
45000000
Scheme
CPV
Description
Construction work
Item 3
Id
C
Related Lot
C

Delivery locations

Entry 1
Region
UKK24

Additional Classifications

Entry 1
Id
45000000
Scheme
CPV
Description
Construction work

Published documents

Entry 1
Id
economic1
Document Type
economicSelectionCriteria
Entry 2
Id
technical1
Document Type
technicalSelectionCriteria

Buyer, suppliers and contacts

Organisation 1
Id
GB-FTS-64407
Name
Bournemouth Christchurch and Poole Council

Roles

buyer

Address

Region
UKK24
Locality
Bournemouth
Postal Code
BH2 6DY
Country Name
United Kingdom
Street Address
BCP Council, Civic Centre, Bourne Avenue

Details

Classifications

Entry 1
Id
REGIONAL_AUTHORITY
Scheme
TED_CA_TYPE
Description
Regional or local authority
Entry 2
Id
01
Scheme
COFOG
Description
General public services

Identifier

Legal Name
Bournemouth Christchurch and Poole Council

Contact

Name
Procurement
Telephone
+44 1202128989
Organisation 2
Id
GB-FTS-75771
Name
The Royal Courts of Justice

Roles

reviewBody

Address

Locality
London
Postal Code
WCA 2LL
Country Name
United Kingdom
Street Address
Strand

Identifier

Legal Name
The Royal Courts of Justice
Organisation 3
Id
GB-FTS-27182
Name
Bournemouth Christchurch and Poole Council

Roles

reviewContactPoint

Address

Locality
Bournemouth
Postal Code
BH2 6DY
Country Name
United Kingdom

Identifier

Legal Name
Bournemouth Christchurch and Poole Council

Recorded locations

  • Buyer location · Bournemouth · UKK24 · BH2 6DY · United Kingdom
  • Delivery location · UKK24

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. ocds-h6vhtk-04d4a7-2025-01-20T13:46:03Zcompiled ·