Opportunity overview
The scope of this contract is: 1.1 Provision of equipment – The contractor is required to provide the necessary machinery for Paint Stripping, Degreasing and Phosphating of guns/gun parts, as part of the Metal Laundry capability at DM Gosport (GOS). 1.2 Servicing and maintenance of machines – The contractor is required to conduct routine servicing and maintenance to the machinery supplied, and to respond and resolve any breakdowns of the machinery. 1.3 Chemical Supply, testing and disposal – The contractor is required to supply the necessary chemicals to allow for the paint stripping, degreasing and phosphating of gun/gun parts. The contractor is also responsible for regular testing of the chemicals being used in these processes and machines, and disposal of chemicals as required. It is proposed to place Single Source Contract with Metal Wash Ltd using the negotiated procedure without prior publication of a contract notice which is allowable under DSPCR 2011Section 16(a)(ii) when, for technical reasons the contract may be awarded only to a particular economic operator.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Metalwash Ltd
- Contract value
- £960k
- Awarded
- Not supplied
- Contract signed
- 16 Jan 2025
- Award ID
- 001669-2025-1
- Status
- active
- Location
- Stroud, UKK, GL6 8GA, United Kingdom
Classification
- CPV50842000 — Repair and maintenance services of weapon systems
Lots
- The scope of this contract is: 1.1 Provision of equipment – The contractor is required to provide the necessary machinery for Paint Stripping, Degreasing and Phosphating of guns/gun parts, as part of the Metal Laundry capability at DM Gosport (GOS). 1.2 Servicing and maintenance of machines – The contractor is required to conduct routine servicing and maintenance to the machinery supplied, and to respond and resolve any breakdowns of the machinery. 1.3 Chemical Supply, testing and disposal – The contractor is required to supply the necessary chemicals to allow for the paint stripping, degreasing and phosphating of gun/gun parts. The contractor is also responsible for regular testing of the chemicals being used in these processes and machines, and disposal of chemicals as required. 1.4 Contract Duration – This contract will be for a duration of 5 yearsValue not stated