Opportunity overview
Bretton Hall Solar will be a community-owned solar PV plant of c.30MW export capacity and battery installation to provide renewable energy for export via the local distribution network and/or directly to nearby heavy power consumers. The project is sited at Bretton Hall, near Broughton in Flintshire on the border between England and Wales and the site extends across the national boundary. We are currently developing an interim 1.5MW scheme. We invite responces to the EPC contract for this interim scheme.
Classification
- CPV45000000 — Construction work
Lots
- Services required: a) Design review (to be completed within 2 weeks of engagement of Principal Contractor). b) Duties of Principal Contractor c) Detail design d) Procurement e) Construction / Installation f) Handover and snagging (defects period) Additional information: The Full ITT is available at the following link - https://www.dropbox.com/scl/fi/4qgdjbas4ps6mcjap3va1/Bretton-Hall-EPC-brief-003-clean.pdf?rlkey=q0uzre6oyjed2xablu39e2ui4&e=1&dl=0Value not stated