Opportunity overview
Harlow District HDC (HDC) is seeking to procure Construction Consultancy Services – Principal Designer. This service forms part of HDC’s commitment to transform Harlow's housing, invest in housing stock and to meet Landlord obligations.The key deliverables under this contract are:• Delivery of Principal Designer services across all relevant projects.• Provision of services that are safe, compliant, and accessible to all residents.• Consistent achievement of the outputs set out in Section 3 (Scope of Requirement).• Transparent reporting to HDC on performance, compliance, and risks. It is assumed that the core services will be required to RIBA 2 – 6 stages, however the exact need will be required a defined in the Building Safety Act 2022.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
McBains Ltd
- Contract value
- £172k
- Awarded
- Not supplied
- Contract signed
- 18 Aug 2026
- Award ID
- 078950-2026-1
- Status
- active
- Identifier
- GB-COH 74995257
- Location
- London, UKI, United Kingdom
Classification
- CPV71000000 — Architectural, construction, engineering and inspection services
- CPV71300000 — Engineering services
- CPV71310000 — Consultative engineering and construction services
- CPV71317000 — Hazard protection and control consultancy services
- CPV71317200 — Health and safety services
- CPV71317210 — Health and safety consultancy services
Lots
- Harlow District HDC (HDC) is seeking to procure Construction Consultancy Services – Principal Designer. This service forms part of HDC’s commitment to transform Harlow's housing, invest in housing stock and to meet Landlord obligations.The key deliverables under this contract are:• Delivery of Principal Designer services across all relevant projects.• Provision of services that are safe, compliant, and accessible to all residents.• Consistent achievement of the outputs set out in Section 3 (Scope of Requirement).• Transparent reporting to HDC on performance, compliance, and risks. It is assumed that the core services will be required to RIBA 2 – 6 stages, however the exact need will be required a defined in the Building Safety Act 2022.Value not stated