Opportunity overview
The Council is seeking to appoint a supplier to design, procure and construct a circa 4MWp solar farm with associated grid connection ("the Project") to the Electricity North-West Distribution Grid at the Burrow Beck site South of Lancaster with grid reference: SD 47901 58388 The scope of this work is for the provision of the Contestable Grid Connection Works, the high voltage customer works and the provision of the low voltage switchgear together with enclosures and associated civil works. This scope of works (the "ICP Scope") includes the contestable grid connection works, all customer connection high voltage works, the supply of transformers, low voltage switchgear and associated cabling, trenching, enclosures and civil works; and The Project is expected to be delivered during 2025 with a target energisation to the grid of October 2025.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
- Contract value
- £910.9k
- Awarded
- Not supplied
- Contract signed
- 17 Mar 2025
- Award ID
- 017333-2025-1
- Status
- active
- Location
- Stockport, UK, SK1 2JD, United Kingdom
Classification
- CPV45000000 — Construction work
Lots
- The Council is seeking to appoint a supplier to design, procure and construct a circa 4MWp solar farm with associated grid connection ("the Project") to the Electricity North-West Distribution Grid at the Burrow Beck site South of Lancaster with grid reference: SD 47901 58388 The scope of this work is for the provision of the Contestable Grid Connection Works, the high voltage customer works and the provision of the low voltage switchgear together with enclosures and associated civil works. This scope of works (the "ICP Scope") includes the contestable grid connection works, all customer connection high voltage works, the supply of transformers, low voltage switchgear and associated cabling, trenching, enclosures and civil works; and The Project is expected to be delivered during 2025 with a target energisation to the grid of October 2025.£600k