Opportunity overview
This opportunity relates to cladding works in relation to : French House: Introduction of compartmentation and removal of the HPL only (Existing combustible insulation and timber battens to remain). Removal of the timber decking to the balconies and top terrace areas. Finch & Margaret House: The existing failed cavity barriers are to be removed and new barriers are to be installed as per manufacturers recommendations at horizontal, vertical, window/door openings and service vents. • The High-Pressure Laminate (HLP) Cladding panels and combustible insulation are to be removed and replaced with a non-combustible alternative - (not required at Margaret House as no HPL). • The timber decking to the balcony attachments are to be removed and replaced with a non-combustible alternative • To Wall Types 2 & 3, the combustible insulation is to be removed and replaced with a non-combustible alternative, should it not be fire treated.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Higgins Group
- Contract value
- £3.3m
- Awarded
- Not supplied
- Contract signed
- 9 Jun 2025
- Award ID
- 038052-2026-1
- Status
- active
- Identifier
- GB-COH 02348986
- Location
- ESSEX, UKI, IG10 3SD, United Kingdom
Classification
- CPV45262650 — Cladding works
Lots
- This opportunity relates to cladding works in relation to : French House: Introduction of compartmentation and removal of the HPL only (Existing combustible insulation and timber battens to remain). Removal of the timber decking to the balconies and top terrace areas. Finch & Margaret House: The existing failed cavity barriers are to be removed and new barriers are to be installed as per manufacturers recommendations at horizontal, vertical, window/door openings and service vents. • The High-Pressure Laminate (HLP) Cladding panels and combustible insulation are to be removed and replaced with a non-combustible alternative - (not required at Margaret House as no HPL). • The timber decking to the balcony attachments are to be removed and replaced with a non-combustible alternative • To Wall Types 2 & 3, the combustible insulation is to be removed and replaced with a non-combustible alternative, should it not be fire treated.Value not stated