Opportunity overview
The BEEMS (British EDF Estuarine and Marine Studies) programme is funded by NNB Generation Company (HPC) Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations.<br/><br/>Cefas require a supplier to conduct intertidal Remotely Piloted Aircraft (RPA) flights, in accordance with the civil Aviation Authority (CAA) guidelines, to monitor potential coastal change and intertidal algal coverage for the Hinkley Point C (HPC) Nuclear New Build project to meet regulatory environmental monitoring requirements.<br/><br/>RPA flights and photography are required: (1) along the Hinkley Point foreshore, and; (2) at Combwich Wharf and the surrounding banks of the River Parrett. Flight/survey design and equipment specification must be sufficient for Cefas to create orthophotos (OPs) and Digital Surface Models (DSMs) with a Ground Sampling Distance (GSD, i.e. resolution) of 3cm/pixel or better (exceptions noted in Appendix 4 - Specification of Requirements).
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
APEM Ltd
- Contract value
- £334.8k
- Awarded
- Not supplied
- Contract signed
- 23 Dec 2024
- Award ID
- 000033-2025-1
- Status
- active
- Identifier
- 02530851
- Location
- Stockport, UK, SK4 3GN, United Kingdom
Classification
- CPV79311000 — Survey services
Lots
- The BEEMS (British EDF Estuarine and Marine Studies) programme is funded by NNB Generation Company (HPC) Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations.<br/><br/>Cefas require a supplier to conduct intertidal Remotely Piloted Aircraft (RPA) flights, in accordance with the civil Aviation Authority (CAA) guidelines, to monitor potential coastal change and intertidal algal coverage for the Hinkley Point C (HPC) Nuclear New Build project to meet regulatory environmental monitoring requirements.<br/><br/>RPA flights and photography are required: (1) along the Hinkley Point foreshore, and; (2) at Combwich Wharf and the surrounding banks of the River Parrett. Flight/survey design and equipment specification must be sufficient for Cefas to create orthophotos (OPs) and Digital Surface Models (DSMs) with a Ground Sampling Distance (GSD, i.e. resolution) of 3cm/pixel or better (exceptions noted in Appendix 4 - Specification of Requirements).£625k