Opportunity overview
As part of the High Speed Rail (London – West Midlands) Act 2017 (HS2 Act), HS2 Ltd has a legal requirement to mitigate its environmental effects. In addition, HS2 Ltd has a requirement through agreements with the Department for Transport to provide environmental benefits. These requirements and provision of benefits include the provision of green assets. HS2 Ltd has acquired much of its land temporarily to construct the railway. Some of this land has been or will be developed into environmental mitigation sites (Green Assets), which range from sites compensating for the loss of grassland, scrub and woodland habitats to new receptor sites for ancient woodland soils, amphibians and reptiles as well as other ecological and landscape mitigation sites. Collectively, this is referred to as our Green Corridor, which, once delivered, will span 3,500ha. Previously HS2 Ltd was intending to appoint Contractor(s) to undertake the Maintenance and Management of green assets which included, but was not limited to the following: • Woodlands; • Grasslands; • Hedgerows; • Ponds, ditches and other non-engineering related drainage features; and • Habitat, including bat houses, reptile banks and hibernacula. HS2 is currently undergoing a programme review to reset the HS2 project (the “Reset”). A decision has been made to abandon the Green Assets Maintenance & Management (GAM&M) procurement due to the revised timings of the programme.
Classification
- CPV45112700 — Landscaping work
- CPV70332100 — Land management services
- CPV77000000 — Agricultural, forestry, horticultural, aquacultural and apicultural services
- CPV77300000 — Horticultural services
- CPV90700000 — Environmental services
- CPV90710000 — Environmental management
- CPV90714000 — Environmental auditing
- CPV90720000 — Environmental protection
- CPV90914000 — Car park cleaning services
Lots
- Maintenance and Management of Phase 1 Area North£78.3m
- Maintenance and Management of Phase 1 Area Central / South£117.4m
- Maintenance and Management of Phase 1 land within the security fence and any operationally sensitive slopes or cuttings.£13.7m
- Abandoned - Maintenance and Management of Phase 1 Area NorthValue not stated
- Abandoned - Maintenance and Management of Phase 1 Area Central / SouthValue not stated
- Abandoned - Maintenance and Management of Phase 1 land within the security fence and any operationally sensitive slopes or cuttings.Value not stated