Opportunity overview
United Utilities (UU) have committed to the rollout of more than 900,000 Smart AMI meters during AMP 8 as a key enabler to reduce water supply volumes (via reductions in per capita consumption (“PCC”), reductions in customer-side leakage (“CSL”) and non-house hold (“NHH”) demand). In order to achieve this UU intend to appoint a single prime contractor to deliver the full scope of services (Smart Meter supply, meter installation and connectivity services/comms), whether directly or through sub-contract arrangements, for the 5 year AMP 8 period, with extension options up to the end of AMP 9.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Network Plus Services Limited
- Published award value
- Value not stated
- Awarded
- Not supplied
- Contract signed
- 10 Jan 2025
- Award ID
- 001117-2025-1-1
- Status
- active
- Identifier
- 04057938
- Location
- Worsley, UK, M28 1XW, United Kingdom
Arqiva Limited
- Published award value
- Value not stated
- Awarded
- Not supplied
- Contract signed
- 16 Jan 2025
- Award ID
- 001791-2025-1-1
- Status
- active
- Location
- Hampshire, UK, United Kingdom
Classification
- CPV32412100 — Telecommunications network
- CPV32430000 — Wide area network
- CPV38421100 — Water meters
- CPV50411100 — Repair and maintenance services of water meters
Lots
- United Utilities (UU) have committed to the rollout of more than 900,000 Smart AMI meters during AMP 8 as a key enabler to reduce water supply volumes (via reductions in per capita consumption (“PCC”), reductions in customer-side leakage (“CSL”) and non-household (“NHH”) demand). In order to achieve this UU intend to appoint a single prime contractor to deliver the full scope of services (Smart Meter supply, meter installation and connectivity services/comms), whether directly or through sub-contract arrangements, for the 5 year AMP 8 period, with extension options up to the end of AMP 9. UU's strategy to implement and manage it's Smart Meter estate is to appoint a single supplier to acquire, deploy, commission, network and maintain the Smart Meter estate. This is being done to provide the necessary feed of data to allow the Company and their customers, to make decisions and change behaviours based upon the consist feed of consumption data. The appointed supplier will be responsible for: (i) Supply of Water Meters, (ii) Communications Unit (if water meter is not an integrated smart meter) (iii) Meter Installation (iv) Communications Network (v) Data management system and; (vi) Meter warranty£260m