Opportunity overview
The provision of emergency call-out services, routine inspection and maintenance of Obsolete and aged (50+ years) Extra High Voltage (EHV) switchgear, transformers and electrical protection only (and not replacement of the same) at Dungeness A, Maentwrog, Trawsfynydd, Wylfa and potentially Hinkley point B.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
National Grid Electricity Transmission
Matched by normalised name
- Published award value
- Value not stated
- Awarded
- Not supplied
- Contract signed
- 11 Feb 2025
- Award ID
- 004809-2025-1
- Status
- active
- Identifier
- 2366977
- Location
- London, UK, WC2N 5EH, United Kingdom
Classification
- CPV50532400 — Repair and maintenance services of electrical distribution equipment
Lots
- The provision of emergency call-out services, routine inspection and maintenance of Obsolete and aged (50+ years) Extra High Voltage (EHV) switchgear, transformers and electrical protection only at Dungeness A, Maentwrog, Trawsfynydd, Wylfa and potentially Hinkley point B.<br/><br/>The expertise and experience requirements for each site are as follows:<br/><br/>Dungeness A, Trawsfynydd & Wylfa<br/><br/>Maintenance of 275 kV and 132 kV Air Blast Circuit Breakers including ability to source, refurbish, remanufacture or replace existing components / equipment. A particular requirement is knowledge and experience of 275 kV Reyrolle OBR60 Air Blast Circuit Breakers.<br/>Maintenance of 275 kV / 11 kV and 132 kV / 11 kV oil filled transformers with in-tank or externally mounted on-load tap-changers.<br/><br/>Maintenance and testing of transformer differential protection systems.<br/><br/>Working under NGET Safety Rules.<br/><br/>Note: The equipment at Wylfa is planned to be decommissioned in 2026 so minimal work is expected to be carried out at Wylfa beyond March 2026.<br/><br/>Due to the agedness and obsolescence of the equipment NRS are currently exploring options to enable the decommissioning of equipment at Trawsfynydd & Wylfa in favour of moving to Distribution Network Operators (DNO’s) during the life of the proposed contract (full replacement of existing and commissioning of new equipment is not a requirement that will be covered by this contract).<br/><br/>Maentwrog<br/><br/>Maintenance of 33 kV SF6 insulated switchgear.<br/>Maintenance of 33 kV / 11 kV generator transformers.<br/>Maintenance and testing of transformer differential protection systems and generator protection systems.<br/><br/>Working under Scottish Power MANWEB Safety Rules.<br/><br/>Hinkley point B<br/><br/>During the life of this contract the responsibility for managing and decommissioning Hinkley point B power station will pass from EDF to NRS and it is possible that similar services may be required at these locations.<br/><br/>However, it is not currently known what arrangements are in place or if existing contractual arrangements will extend beyond the handover dates and therefore require novating to NRS.Value not stated