PROCUREMENT OPPORTUNITY

HE0914 A350 Chippenham Duelling Scheme April 2023

Wiltshire Council · compiled

Tender information last checkedLast checked 29 Sept 2026, 18:45.

Opportunity overview

he A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster. It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass. Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids. Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham. In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022. Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025. The scheme is likely to include for the following key elements Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway. Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass. Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works. The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works. The works will be contained within the existing highway boundary extents and there should be no requirement for additional land. The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated. The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required. There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.

Awarded to

Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.

MJ Church (Plant) Ltd

Match pending…
Contract value
£21.2bn
Awarded
Not supplied
Contract signed
28 Apr 2025
Award ID
018102-2025-HE0914 A350-1
Status
active
Location
Chippenham, UKK15, SN14 0RN, United Kingdom

Classification

  • CPV45233100 — Construction work for highways, roads
  • CPV45233120 — Road construction works
  • CPV45233121 — Main road construction works
  • CPV45233122 — Ring road construction work
  • CPV45233124 — Trunk road construction work
  • CPV45233128 — Roundabout construction work
  • CPV45233130 — Construction work for highways
  • CPV45233210 — Surface work for highways
  • CPV45233221 — Road-surface painting work
  • CPV45233224 — Dual carriageway construction work
  • CPV45233280 — Erection of road-barriers
  • CPV45233290 — Installation of road signs
  • CPV45233293 — Installation of street furniture
  • CPV45233300 — Foundation work for highways, roads, streets and footpaths
  • CPV45233310 — Foundation work for highways

Lots

  • he A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster. It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass. Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids. Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham. In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022. Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025. The scheme is likely to include for the following key elements Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway. Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass. Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works. The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works. The works will be contained within the existing highway boundary extents and there should be no requirement for additional land. The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated. The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required. There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.£22m

Published notice details

Additional information from the published procurement release. Fields appear only when supplied by the source; check the original notice and tender documents before acting.

Scope, procedure and submissions

Id
DN637737
Status
complete
Has Recurrence
No
Procurement Method
selective
Main Procurement Category
works
Procurement Method Details
Restricted procedure

Covered By

GPA

Amendments

Entry 1
Id
1

Unstructured Changes

Entry 1

Where

Label
Time limit for receipt of tenders or requests to participate
Section
IV.2.2

New Value

Date
31 May 2023, 12:00

Old Value

Date
30 May 2023, 12:00

Legal basis

Id
32014L0024
Scheme
CELEX

Tender Period

Ends
30 May 2023, 12:00

Communication

Future Notice Date
27 Apr 2023, 00:00

Classification

Id
45233100
Scheme
CPV
Description
Construction work for highways, roads

Submission terms

Languages

en

Submission Method

electronicSubmission

Lots and requirements

Entry 1
Id
1
Status
cancelled
Has Options
No
Has Renewal
No
Description
he A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster. It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass. Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids. Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham. In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022. Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025. The scheme is likely to include for the following key elements Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway. Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass. Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works. The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works. The works will be contained within the existing highway boundary extents and there should be no requirement for additional land. The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated. The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required. There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.

Value

Amount
22,000,000
Currency
GBP

Award criteria

Criteria

Criterion 1
Name
Quality
Type
quality
Description
40
Criterion 2
Type
price
Description
60

Contract period

Ends
2 Feb 2026, 23:59

Submission terms

Variant Policy
notAllowed

Items and delivery

Item 1
Id
1
Related Lot
1

Delivery locations

Entry 1
Region
UKK15
Entry 2
Region
UKK15
Entry 3
Region
UKK15
Entry 4
Region
UKK15
Entry 5
Region
UKK15

Additional Classifications

Entry 1
Id
45233120
Scheme
CPV
Description
Road construction works
Entry 2
Id
45233121
Scheme
CPV
Description
Main road construction works
Entry 3
Id
45233122
Scheme
CPV
Description
Ring road construction work
Entry 4
Id
45233128
Scheme
CPV
Description
Roundabout construction work
Entry 5
Id
45233221
Scheme
CPV
Description
Road-surface painting work
Entry 6
Id
45233224
Scheme
CPV
Description
Dual carriageway construction work
Entry 7
Id
45233124
Scheme
CPV
Description
Trunk road construction work
Entry 8
Id
45233210
Scheme
CPV
Description
Surface work for highways
Entry 9
Id
45233280
Scheme
CPV
Description
Erection of road-barriers
Entry 10
Id
45233290
Scheme
CPV
Description
Installation of road signs
Entry 11
Id
45233130
Scheme
CPV
Description
Construction work for highways
Entry 12
Id
45233293
Scheme
CPV
Description
Installation of street furniture
Entry 13
Id
45233300
Scheme
CPV
Description
Foundation work for highways, roads, streets and footpaths
Entry 14
Id
45233310
Scheme
CPV
Description
Foundation work for highways

Buyer, suppliers and contacts

Organisation 1
Id
GB-FTS-2791
Name
Wiltshire Council

Roles

buyer

Address

Region
UKK15
Locality
Trowbridge
Postal Code
BA14 8JN
Country Name
United Kingdom
Street Address
Wiltshire Council, County Hall, Bythesea Road

Details

Classifications

Entry 1
Id
REGIONAL_AUTHORITY
Scheme
TED_CA_TYPE
Description
Regional or local authority
Entry 2
Id
01
Scheme
COFOG
Description
General public services

Identifier

Legal Name
Wiltshire Council

Contact

Name
Mr Dave Gillett
Telephone
+44 1255713371
Organisation 2
Id
GB-FTS-81434
Name
High Court of England and Wales, The Royal Court of Justice

Roles

reviewBody

Address

Locality
London
Postal Code
WC2A 2LL
Country Name
United Kingdom
Street Address
Strand

Identifier

Legal Name
High Court of England and Wales, The Royal Court of Justice
Organisation 3
Id
GB-FTS-145721
Name
MJ Church (Plant) Ltd

Roles

supplier

Address

Region
UKK15
Locality
Chippenham
Postal Code
SN14 0RN
Country Name
United Kingdom
Street Address
Saltersford Lane

Details

Scale
sme

Identifier

Legal Name
MJ Church (Plant) Ltd
Organisation 4
Id
GB-FTS-69555
Name
High Court of England and Wales

Roles

reviewBody

Address

Locality
London
Postal Code
WC2A 2LL
Country Name
United Kingdom
Street Address
The Royal Court of Justice, Strand

Identifier

Legal Name
High Court of England and Wales

Award information

Award 1
Id
018102-2025-HE0914 A350-1
Title
HE0914 A350 Chippenham Duelling Scheme April 2023
Status
active

Suppliers

Supplier 1
Id
GB-FTS-145721
Name
MJ Church (Plant) Ltd

Related lots

1

Contracts and changes

Entry 1
Id
018102-2025-HE0914 A350-1
Title
HE0914 A350 Chippenham Duelling Scheme April 2023
Status
active
Award ID
018102-2025-HE0914 A350-1
Date Signed
29 Apr 2025, 00:00

Value

Amount
21,191,000,000
Currency
GBP

Recorded locations

  • Buyer location · Trowbridge · UKK15 · BA14 8JN · United Kingdom
  • Delivery location · UKK15

Notice and amendment history

1 published notice version reviewed by ProcuraAxis.

1 VERSION
  1. ocds-h6vhtk-037589-2025-04-30T15:29:23+01:00compiled ·