Opportunity overview
This project includes, but is not limited to the following packages of work: A new chemical storage and dosing system to aid Phosphorus removal A new pre-aeration primary tank supernatant and RAS mixing and distribution chamber A new activated sludge aeration lane that matches existing with two new 35 m diameter final settlement tanks and RAS system A new Tertiary Solids Removal treatment stage A new standby power facility A new centrate storage tank and pump system to return centrate for treatment A new Picket Fence Thickener to operate in parallel to two existing units A new liquor return pump station to return site liquors for treatment
Classification
- CPV45000000 — Construction work
- CPV45210000 — Building construction work
Lots
- Lot 1 (Design and Build)£320m
- Lot 2 (Build Only)£120m