Opportunity overview
The Construction of a Multi Storey Car Park to the site at Beck Hill, the works are designed and will be carried out under NEC Option B for demolition works and enabling works, followed by the construction of a multi-Storey Car Park, elements of the work will require some contract or design. There will be associated civil engineering work in connection with the diversion of the existing Gypsey Race River in connection with the development. The overall scheme will provide 429 parking spaces comprising 392 standard parking bays and 31 accessible bays along with 6 Electrical Vehicle Charging Points. 8 motorcycle parking spaces and 12 cycle spaces will also be provided to the site.
Awarded to
Amounts belong to published awards or contracts. Where several suppliers share one value, it is labelled as shared and is not a supplier-specific allocation.
Henry Boot Construction Ltd
- Contract value
- £12.9m
- Awarded
- Not supplied
- Contract signed
- 4 Mar 2025
- Award ID
- 039855-2025-1
- Status
- active
- Identifier
- GB-COH 2880202
- Location
- Derbyshire, UKF1, United Kingdom
Classification
- CPV45000000 — Construction work
Lots
- The Construction of a Multi Storey Car Park to the site at Beck Hill, the works are designed and will be carried out under NEC Option B for demolition works and enabling works, followed by the construction of a multi-Storey Car Park, elements of the work will require some contract or design. There will be associated civil engineering work in connection with the diversion of the existing Gypsey Race River in connection with the development. The overall scheme will provide 429 parking spaces comprising 392 standard parking bays and 31 accessible bays along with 6 Electrical Vehicle Charging Points. 8 motorcycle parking spaces and 12 cycle spaces will also be provided to the site.£13m