UK Fusion Energy Ltd
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PCRM-7973-DCBL
- Address
- Abingdon, UKJ14, OX14 3DB, United Kingdom
- First notice
- 14 Mar 2025
- Latest notice
- 2 Oct 2026
Published procurement activity · 128 tenders
Buyer information published with procurement notices.
The MEN aims to gather information on relevant interested organisations (and their capabilities and expertise) that would be interested in contributing to the delivery of the second phase of the STEP programme (2025-2030) on an aspect related to 15-15Ti Austenitic stainless steel for in-vessel applications. For more information
The current Preliminary Market Engagement Notice aims to gather information on relevant interested organisations (and their capabilities and expertise) that would be interested in contributing to the delivery of the second phase of the STEP programme (2025-2030) by producing 316LN(IG) Austenitic stainless steel for in-vessel app
The current MEN aims to gather information on relevant interested organisations (and their capabilities and expertise) that would be interested in contributing to the delivery of the second phase of the STEP programme (2025-2030) on an aspect related to low-activation WC for in-vessel applications. UKIFS is planning to procure s
UKIFS is seeking to identify and gather information from suppliers with the capability to support the early procurement of PdAg alloy (specifically in a 75/25% composition) for the STEP (Spherical Tokamak for Energy Production) Fuel Cycle development programme. This includes the supply of the alloy in various forms, such as tube
UKIFS seeks to gather information from potential suppliers on solutions and capabilities in relation to the provision of material-coolant performance under relevant fusion environments. This is not a request for quotation but a preliminary stage to assess the market. For more information about this opportunity, please visit the
UKIFS seeks to ascertain cost modelling and programme costing support from June 2025 for an 18-month period. The cost estimation team for STEP are responsible for the production of the Whole Programme Cost Estimate for the project lifecycle of STEP, including management, engineering design, manufacture, assembly, commissioning
This MEN aims to gather information from potential suppliers on solutions and capabilities in relation to the provision of a laser and spectrometer system for Raman spectroscopy. This is not a request for quotation but a preliminary stage to assess the market.
The purpose of this MEN is to assess the industry appetite for furthering the design of key matter injection technologies and future bids for work packages relating to the following planned testing: 6.3. Gas Gun Development for SPI, Centrifuge development for pellet injection and Extruder Development for pellet production.
This Notice aims to gather information from potential suppliers on facilities, capabilities, availability and estimated costs in relation to High Heat Flux (HHF) Testing of Plasma Facing Components (PFC). This is not a request for quotation but a preliminary stage to assess the market.
The purpose of this MEN is to assess the industry appetite for furthering the design of key matter injection technologies and future bids for work packages relating to the following planned testing: 6.3. Gas Gun Development for SPI, Centrifuge development for pellet injection and Extruder Development for pellet production.
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.