UK Atomic Energy Authority
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PLJV-1169-JTDD
- Address
- Oxfordshire, UKJ14, OX14 3DB, United Kingdom
- First notice
- 25 Mar 2025
- Latest notice
- 20 Oct 2026
Published procurement activity · 217 tenders
Buyer information published with procurement notices.
Installation of new storage nodes and relocation of existing storage nodes within the same system
Fusion APPG support for 26/27
The United Kingdom Atomic Energy Authority are looking to engage a Supervisory Control And Data Acquisition (SCADA) specialist to develop a new SCADA system in J5 based on the IEC 61850 protocol, replacing the existing SCADA. The 400/33kV substation, the existing control and automation system, comprising historic CODAS system, S
UKAEA is undertaking refurbishment works to the J5 electrical infrastructure to support the ongoing operation and reliability of the Culham Campus power distribution network. As part of these works, new 33 kV high-voltage cables are required to replace existing assets and support the future electrical capacity Requirements of th
Industry Simulation Software for Fusion is a multi year rolling project aiming to define Fusion relevant analysis and simulation case studies and use them as a formal basis to engage industry for evaluation of their simulation software capability and identify development needs. The case studies will span the full range of domain
UKAEA wishes to engage with contractors, Small to Medium Enterprises (SME), designers, and manufacturers for the supply of an activation foil retrieval system for the LIBRTI Facility
This specification covers the United Kingdom Atomic Energy Authority’s (“the Authority’s”) requirement for diagnostics equipment for the LIBRTI facility project, including LOT 1: High-Purity Germanium Detectors LOT 2: Multi-Channel Analysers and High-Voltage Power Supplies
For this project We have 6 modules. Each module is made up of 3 stages. These stages are (1) an x-y stage, (2) a tilt goniometric stage, and (3) rotational stage. The links to these stages and the control box can be seen in the attached supporting document. The difference between our stages and the COTS stages is that each stage
UKAEA is now seeking market input regarding the implementation of an information management capability that will utilise data held within the Data Lakehouse and maintain relationships with information held in other authoritative UKAEA systems
Open the opportunity to review the published procurement information.
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.