Published procurement activity · 218 tenders
Buyer information published with procurement notices.
Modification of existing software to allow for progression of project.
The United Kingdom Atomic Energy Authority requires the services of periodic statutory inspections of lifting equipment in accordance with the requirements of the Lifting Equipment and Lifting Operations Regulations 1998 (LOLER) and other equipment in accordance with the Provision and Use of Work Equipment Regulations 1998 (PUWE
The UK Atomic Energy Authority has a requirement for the Supply & Installation of Water Cooling System Components for a relocated Vacuum Furnace at its Culham Campus site, Oxfordshire. The requirement must fit with a previously supplied vacuum furnace and operate at the furnace parameters.
The requirement relates to the continuation of existing electrical, remedial, snagging, labelling, energisation/de-energisation support, commissioning support and integration works being undertaken by Optimum Electrical Engineering Ltd on the ESS Active Cells Facility project in Lund, Sweden. Optimum has been delivering the elec
The requirement relates to the continuation of existing electrical, remedial, snagging, labelling, energisation/de-energisation support, commissioning support and integration works being undertaken by Optimum Electrical Engineering Ltd on the ESS Active Cells Facility project in Lund, Sweden.
The UK Atomic Energy Authority has a requirement for the provision of an Incineration of Radioactive Waste Removal Service from it's site at Culham Campus, Abingdon, Oxfordshire. The contract is for an initial period of one year with the option to extend annually for up to a further 4 years.
UKAEA has a requirement for the design, manufacture, testing, delivery, installation, and commissioning of a new water chiller system to provide primary circuit cooling for the D15 High Voltage Power Supply equipment used on MAST-U.
Safety and Security systems for H3AT facility
The purchase, delivery, and installation of an ESLumen LIBS system to fit into UKAEA's recently purchased Laser Ablation System. For compatibility and business continuity purposes the most suitable route was to purchase this from the supplier of the Laser Ablation System.
A Simultaneous 5 Axis Mill/Turn CNC Lathe which must have the following: Siemens Control Technology Control compatible with HyperMill Post Processing High Pressure Coolant Feed (min 80 bar and with through coolant spindle) Minimum of 60 tools ideally Capto Style to suit existing tooling Twin Spindles.