UK Atomic Energy Authority
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PLJV-1169-JTDD
- Address
- Oxfordshire, UKJ14, OX14 3DB, United Kingdom
- First notice
- 25 Mar 2025
- Latest notice
- 20 Oct 2026
Published procurement activity · 218 tenders
Buyer information published with procurement notices.
The LLiMFA is at a preliminary design stage and UKAEA are now looking for potential suppliers to progress the design development and produce a Detailed Design of the test loop for the Fusion Technology Facility alongside CHIMERA. Creation of the LLiMFA will allow the supply of Liquid Lead Lithium to both test apparatus, for the
The Detailed Design, Manufacture, Testing and Supply of DBB Cryopump Stillage and Lifting Frame.
Repair of the Hypervapotron Water Cooling Stub due to failed leak testing. The work will be undertaken by the OEM who has a unique knowledge of the original item with detailed understanding of the design and manufacture who has developed, trialled, tested and implemented the desired repairs in the fusion industry.
The UK Atomic Energy Authority has a requirement for MAST-U Fusion research facility which requires a new high current power supply to the Pc, P4 and P5 magnet coils.
Supply of Powerlite 9030 DLS Nd YAG Laser 1064 nm, 30 Hz, 1.6 J, vertical output polarisation
Lease agreement for ongoing property rental.
120 off titanium-based filaments are required for the operation of the Neutral Beam getter pumps (Titanium sublimation pumps) as a vital component of the MAST-U NBI Vacuum system. The length of the filaments is 1800mm designed to be installed into the NBI custom-built pumps for the MAST/MAST-U Neutral beam vacuum vessels.
The United Kingdom Atomic Energy Authority (UKAEA) are undertaking the JET Decommissioning and Repurposing (JDR) programme, a multi-year programme in which the Joint European Torus (JET) fusion system will be decommissioned and key infrastructure is repurposed for further use. The JET tokamak, and the associated supporting syste
100kN load cell reversible (tension/compression, so it has to be a Universal Test System) • Velocities of cross hair 0.1mm/min to 1 mm/min (typical range of usage) • Floor mounted (to achieve large travel) • Length of crosshead travel min 1m, 1.4m with grips attached (to be compatible with existing test equipment and test needs)
This tender is to find supplier for Monitoring of facility stack and workplace tritium discharges to comply with site permits
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.