Stockton on Tees Borough Council
Buyer information published with procurement notices.
- Published identifier
- Not supplied
- Address
- Stockton on Tees, UKC11, TS176BJ, United Kingdom
- First notice
- 13 Feb 2025
- Latest notice
- 22 Oct 2026
Published procurement activity · 169 tenders
Buyer information published with procurement notices.
Stockton Borough Council has been successful in obtaining funding from Tees Valley Combined Authority's Levelling Up Fund, which included an allocation for improvements to the Cycle Network linking areas of Stockton to Stockton Town Centre. The deadline for the funding stipulates that all spend must be made and the project compl
Utility apparatus belonging to Northern PowerGrid has been identified as a constraint in the delivery of a new footpath cycleway scheme. To achieve a compliant scheme to LTN1/20 and satisfy the requirements of Active Travel England it is necessary to divert their apparatus to prevent construction issues
Stockton Borough Council has been successful in obtaining funding from Tees Valley Combined Authority's City Region Sustainable Transport Settlement, which included an allocation for improvements to the Cycle Network between Thornaby and Stockton Town Centre. The deadline for the funding stipulates that all spend must be made an
The Yarm High Street Public Realm has been designed to include new paving and associated materials. The Town Centres Investment Team have been leading on a preconstruction 'PCSA' process to design and cost a public realm improvement scheme along Yarm High Street.
This is part of a larger piece of work proposed to undertake refurbishment and remodelling on St John the Baptist Primary School site to create a dedicated wing of accommodation for special needs children. This first phase of work will provide essential changing facilities for the 24 Sen children who are now in school, with incr
This is part of a larger piece of work proposed to undertake refurbishment and re-modelling on St John the Baptist Primary School site to create a dedicated wing of accommodation for special needs children. This first phase of work will provide essential changing facilities for the 24 Sen children who are now in school, with inc
This is part of a larger piece of work proposed to undertake refurbishment and re-modelling on St John the Baptist Primary School site to create a dedicated wing of accommodation for special needs children. This first phase of work will provide essential changing facilities for the 24 Sen children who are now in school, with inc
Installation of photovoltaic modules on the swimming pool roof of the Billingham Forum to reduce the electric running costs and Co2 emissions associated with the Leisure Centre. The installed photovoltaic modules will generate an output of 191kWp from a generator surface of 361 PV modules which equates to 32t saving on Co2 emiss
This tender is applicable to Residential Care Homes located within the boundaries of the Borough of Stockton-on-Tees. The Care Home will be registered with the Care Quality Commission for the regulated service - Accommodation for persons who require nursing or personal care, with the specialism of learning disabilities. It is no
Direct Award from NEPO207 Construction Works Lot 2
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.