Scottish Hydro Electric Power Distribution PLC
Buyer information published with procurement notices.
- Published identifier
- GB-COH SC213460
- Address
- Perth, UKM77, PH1 3AQ, United Kingdom
- First notice
- 21 Mar 2025
- Latest notice
- 5 Oct 2026
Published procurement activity · 20 tenders
Buyer information published with procurement notices.
Funding to be provided for 99.3 hectares of woodland restoration. To ensure measurable ecological enhancement to support regulatory compliance, this work should be undertaken by specialist nature market providers. Nature market providers apply specialist ecological expertise to design, implement and monitor habitat improvements
Scottish Hydro Electric Power Distribution (SHEPD) have a continuous need for ongoing maintenance of 11kV Voltage Regulators manufactured by Cooper Power Systems (Eaton). Supplied solely by Langley Engineering in the UK, the 11kV Voltage Regulators are specified by planners as a cost-effective alternative to line reinforcement.
Within the ED2 price control period, SHEPD were provided with Ofgem funding to plant up to 17 hectares of seagrass meadows in order to aid biodiversity recovery, support climate adaptation pathway and provide carbon sequestration. Seagrass is found in inter-tidal and sub-tidal zones at a depth of around 10m in silt/mud environme
Load Managed Areas (or LMAs) are DCUSA provision that allows electricity loads that can be switched on remotely to be controlled so that they do not all switch on at the same time. This has typically been used for managing the charging of electric storage heaters and water tanks so that households access the cheapest possible el
SSEN are the electricity Distribution Network Operator (DNO) responsible for delivering power to 3.8 million homes and businesses and homes across central southern England and the north of Scotland. We serve some of the most diverse and unique geographies across the UK, and keep customers and communities connected whilst develop
The provision of innovative fault ride through / island mode stability / fast response (hereafter referred to as 'Standby') services or equipment to provide continued security of supply to homes and businesses on the islands in the event of planned or unplanned outages on the transmission link.
Scottish and Southern Electricity Networks (SSEN) build and operate networks to best meet customer needs using the most efficient and flexible techniques possible. To do this, we have introduced Flexibility to help manage our network in the optimal way. The primary use case for Flexibility Services has been the economically effi
At Scottish and Southern Electricity Networks (SSEN), we are seeking suppliers capable of working on Pole Mounted Reclosers (PMRs) and Pole Mounted Circuit Breakers (PMCBs) while the network remains energized. SSEN currently faces operational restrictions on Whip and Bourne PMCBs and PMRs, requiring network de-energization, whic
The authority established a Dynamic Purchasing System (DPS) as a means to procure Flexibility Services. This notice is to confirm that no further contracts will be awarded under this specific DPS.
Scottish Hydro Electric Power Distribution Plc (SSEN) established a Dynamic Purchasing System (DPS) as a means of procuring Demand Diversification Services in support of the Load Managed Areas innovation project trial. This notices is published to confirm no further contracts will be awarded under this DPS.
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.