Rail Safety Standards Board (RSSB)
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PVGN-9767-BLPT
- Address
- London, UKI31, EC3M 5AD, United Kingdom
- First notice
- 18 Mar 2025
- Latest notice
- 15 Oct 2026
Published procurement activity · 82 tenders
Buyer information published with procurement notices.
RSSB is seeking to appoint a supplier to undertake research into the future management of per- and polyfluoroalkyl substances (PFAS) across the GB rail industry. The project will assess gaps in existing engineering, safety, assurance, materials disclosure and waste-management processes; develop a proportionate approach for asses
RSSB seeks to procure research consultancy support to help shape both the report itself and the underlying evidence base. The work is expected to be delivered in two linked workstreams: one focused on the structure, narrative and presentation of the report; and one focused on capturing, collating and organising data from across
Accreditation services related to equality, diversity and inclusion.
DC electrification is a system used to provide electric traction power to trains via an exposed conductor rail, commonly described as the ‘3rd rail’. The 3rd rail system is predominantly used in the south of England but is also used by the Merseyside commuter rail network in the North-West. Because of its accessible position on
Establishment of a comprehensive brand and marketing strategy to support RSSB's role in the transformation of Britain's rail industry.
Brokerage services for private medical and dental insurance and an employee assistance programme to support with the management and annual market testing and renewal of these services.
RSSB is updating the Safety Risk Model to version 10 (SRM v10). Most work will be handled internally, but an external supplier is needed for specific tasks in modelling and integration from May to December 2026. Tasks include: 1.Development of escalation factors for the suite of train accident models 2.Development of injury ato
RSSB is seeking support from an external supplier to update the GSM R failure model, with the work expected to be carried out between June and September 2026. The supplier should have experience in quantified risk analysis and statistical techniques, up to date knowledge of the Safety Risk Model, and a strong understanding of th
RSSB is seeking to procure a research supplier to deliver the project scope detailed in the Work Packages (WPs) detailed in the Project Scope. The Objectives of the RICCs are to: 1. Develop a GB rail specific translation of the ICMS 3 asset taxonomy that maintains full ICMS 3 compatibilities while enabling like-for-like comparis
This requirement is concerned with the generation of a rail reform report.
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.