Northern Lighthouse Board
Buyer information published with procurement notices.
- Published identifier
- Not supplied
- Address
- Edinburgh, EH2 3DA, UK
- First notice
- 21 Mar 2025
- Latest notice
- 5 Oct 2026
Published procurement activity · 67 tenders
Buyer information published with procurement notices.
Looking for an experienced approved supplier to supply parts and carry out repairs on our Rib Davit, on our ship NLV Pharos. The current Davit on our NLV Pharos Rib is out of service as a result of a recent mandatory inspection and cannot be used currently. It is a Ned Deck davit type PRH 35, suppliers must have the approval to
Northern Lighthouse Board (NLB) is looking for a contractor to complete upgrades to the timber beams at the pier at our NLB depot in Oban, PA34 4LS. The central section of the pier consists of a T-shape extension to the original pier added in the 1950’s. This provided a front edge of approximately 49m and allowed for berthing in
Northern Lighthouse Board (NLB) is looking for a supplier to install a new unlit beacon in the Loch Spelve sea loch on the southeast coast of the Isle of Mull. It will be located in the channel to Loch Spelve at Latitude 56° 23.230’N, Longitude 005° 42.012’W. Brief overview The unlit beacon is a 7.5m high stainless steel pole s
Description of Works Cantick Head Lighthouse is accessed via a privately owned, single-track, unsurfaced road located beyond the end of the B9047 public road on South Walls, Orkney. The road provides the only vehicular route to the lighthouse and adjacent residential properties. The site is operational, with mains power and road
Key Details: •Tender Reference: ENPR/LLHI/2560 •Tender Return Deadline: 23 October 2025 •Site Visit (Mandatory): 14 October 2025 •Expected Start Date: Early December 2025 •Platform: Full details and tender documents will be available via Delta eSourcing. Project Overview: The works will involve minor civil maintenance and the ap
NLB have a requirement to purchase replacement rescue stretcher kits and spinal splints and some additional spinal splints. Amounts are: 16x stretcher kits and 16x spinal splints to replace existing ones that the 10-year lifespan expires in 2026. An additional 12x spinal splints to pair with existing SLIX stretchers that do not
Scope: Fabrication of Unlit Beacon - Loch Spelve We require a skilled fabricator to carry out the scope of works as below •Purchase of fabrication materials •Fabrication of structure •Delivery of structure to NLB Oban Depot Proposed Works Fabricate a 7.5m high x Ø 457mm x 12mm thick Circular Hollow Section (CHS) stainless steel
We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds
Requirements NLB have a requirement for a supplier to manage the purchase of various items for our new vessel currently being built in Spain. The Vessel First Fill Spreadsheet provides a full list of all required items; one key aspect is the quality of the products that are offered. NLB are looking for a successful supplier to
This opportunity defines requirements for solar photovoltaic (PV) modules. This contract is SUPPLY ONLY. Modules will be installed by GLAs on remote, unmanned stations, vessels and buoys in coastal environments to serve as the power supply for marine aids to navigation (AtoN). Long-term reliable operation of the equipment at the
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.