North Somerset Council
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PVVX-9588-WCMV
- Address
- Weston-super-Mare, UKK12, BS23 1UJ, United Kingdom
- First notice
- 6 Jan 2025
- Latest notice
- 19 Oct 2026
Published procurement activity · 139 tenders
Buyer information published with procurement notices.
Clerk of Works services to oversee the restoration of Birnbeck Pier contractor works
This contract is to provide essential design services for MetroWest Phase 1 to finalise the designs required for construction for the following packages: Marsh Lane Bridge; Sheepway Bridge; Portbury Station Bridge; and Royal Portbury Dock Bridge.
North Somerset Council charge for garden waste collections under an annual subscription. As part of this service, permit stickers or tags are mailed out to residents who subscribe to the service each year. The colour of the permits changes annually to allow for crews to identify properties that have subscribed for that year.
Delivery of Bikeability Training at Levels 1, 2 and 3 as per the funding available to North Somerset Council through the Bikeability Trust.
This contract has been prepared specifically, for carrying out scheduled Principal Inspections to 12 number of Highway Structures, which require specialist professional service provider to inspect, inaccessible elements of the highway bridges: either diving into the water or access into a confined space with a specialist equipme
Works to restore the Birnbeck Pier Structure connecting the mainland to the Birnbeck Island. This structure is Listed Grade II*. In summary, the works within scope are: • The removal, renovation and replacement of Birnbeck Pier bridge. • Dismantling and re-erection of the two bridge abutments. • Reinstatement of 14 No. Semi-circ
The MetroWest Phase 1 project required Habitat Regulations Assessment (HRA) consent from Natural England, due to the proposed works in the Avon Gorge Special Area of Conservation (SAC). Part of the mitigation proposed for the impacts in the gorge is positive management works to Leigh Woods on Forestry England land, as compensati
Urgent works to stabilise the Council-owned slipway at The Beach, Clevedon, including Reinstating local beach levels and infilling the void beneath the slipway, broken handrailing repair, repairing and stabilising the slipway/edge details to re-establish robust toe protection for the sea wall.
Specialist concrete repairs to the ceiling and walls in the plant room at the leisure centre. Remedial works are required to repair the current areas of corrosion-induced cracking and delamination of the concrete are repaired, which will secure the concrete and prevent further deterioration.
Legal pre-construction activities including updating landowner information, serving notices on landowners and completing the Compulsory Acquisition process following Full Business Case approval.
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.