The supply and installation of 10 mm plywood to ceilings along with 4" x 2" brackets to a cloud design, is required for all offices on the Gr. Floor The installation of covers, strips and two coats of paint is also necessary. Finally, 200 mm holes must be cut to accommodate the luminaires, which are to be supplied by a third par
Supply and install a pitched roof to the museum, including an allowance for scaffolding. Although the windows are to be supplied by others, you are responsible for coordinating the associated works. Supply and install Flat roof above the designated Multi faith room. The price should include scaffolding
Wall & Ceiling to be primed and rubbed down in preparation for painting. All rooms are to be painted with two coats of white emulsion.
Supply and fit batten to walls Supply and fit Boxing in to Heated skirting pipework throughout building E, E1 & E2
Supply and install High Integrity Earthing& Containment between new sub station and existing using 120mm CPC Supply and install temporary2 x 70mm 4C SWA cable from the old sub station to the new 400A Panel board (due to late delivery by UKPN of main power supply)
Make good walls and ceilings paint with two coats of emulsion Paint all woodwork with undercoat and topcoat eggshell
Construct, supply and install 2 No. Unisex in Block E Gr. Floor.
Install 6mm WEP plywood sub floor and tile carpet Supply and lay 3mm latex smoothing compound to sub-floor. Supply and install Polyflor Forest FX (colourtbc) 2mm sheet vinyl flat lay in Corridors, WCs.
Fit doors to offices with a Paxton wireless door handle (access control),as per the door schedule. The kitchen and toilets will be fitted with standard door handles. The contractor shall repair all damaged frames and paint the doors and frames in the colour scheme issued by Nelft Project Management.
The works include the reconstruction of two unisex toilets and one disabled toilet facility on the first floor of Block E, incorporating all required demolition, construction, plumbing, joinery, finishes, and installation of sanitary fittings to provide fully functional and compliant facilities. 2. Demolition and Strip-Out • Cut