Network Rail Infrastructure Limited
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PNZN-9524-VCQJ
- Address
- London, UKI45, SE1 8SW, United Kingdom
- First notice
- 26 Mar 2025
- Latest notice
- 19 Oct 2026
Published procurement activity · 339 tenders
Buyer information published with procurement notices.
The framework will deliver reactive and planned preventative maintenance (PPM) mechanical and electrical (M&E) maintenance at Kings Cross & St Pancras (Platforms A&B) stations, including maintenance for the Power Signal Box (PSB) at Kings Cross.
Xeiad Ltd was appointed through Lot 2 the competitive framework procurement completed in 2026. The requirements cover provision of CEFA structures examination services for assets within the Great Western Region during CP7 Year 3; the award is in accordance with the approved framework call-off mechanism. The inspection, examinat
Civils examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failure
Linked to - ocds-h6vhtk-069bb1 - System not allowing linking Autumn Response Teams (ART) provide proactive and reactive mitigation to manage low adhesion risk, protect operational safety, and improve overall network performance. Autumn is historically one of the most challenging seasons for railway operations due to railhead con
A competitive tender process was undertaken in 2021 to procure a First of Type (FOT) next-generation Road Rail Mobile Elevated Working Platform (MEWP) designed specifically to meet the requirements of the newly electrified Western Route. Following this competition, Fitzgerald Plant Services was awarded the contract and has since
The Contractor shall provide a managed service for the deployment, operation, and support of geofencing-enabled devices and Virtual Worksite Marker Boards (WSMBs) across Network Rail’s East Midlands Route. The service shall include device supply (hire), implementation, programme management, and ongoing support for the 12-month s
The hire of 5 MK2E BUO Carriages for use in the Infrastructure monitoring fleet. This is for the continued hire of the same set of vehicle Network Rail has been using since 2019 which have undergone significant bespoke modification to make them compatible for use in Infrastructure Monitoring Train operations. The scope of this c
Civils examinations within Network Rail refer to the inspection, examination and reporting of structural assets to ensure the safety, reliability, and longevity of railway infrastructure. These examinations help identify defects, monitor structural integrity, and determine necessary maintenance or repair works to prevent failure
Network Rail Infrastructure Limited has directly awarded a contract for the supply of electricity to the Dollands Moor Freight Yard in Kent. The service comprises the provision of electricity via the existing infrastructure connection serving the site, together with associated metering, billing and account management services ne
This procurement is for the collection, overhaul, and delivery of approximately 2,500 wheelsets per year across Network Rail’s fleet. It will be delivered under a multi-supplier, zero-value framework agreement structured into five lots based on operational groupings and technical complexity. The scope includes overhaul of wheels
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.