Natural Resources Wales
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PBBR-3628-MPRN
- Address
- Cardiff, UKL22, CF10 3NQ, United Kingdom
- First notice
- 30 Jan 2025
- Latest notice
- 20 Oct 2026
Published procurement activity · 122 tenders
Buyer information published with procurement notices.
To meet the increasing sensitivity demands of new analytical methods that ensure compliance with Environmental Quality Standards (EQS), the existing instrumentation requires upgrading to the Bruker VIP-HESI ion source together with two replacement PCs. The current setup is no longer capable of supporting the precision required
Annual Telemetry System Maintenance for Natural Resources Wales supplied by Schneider Electric from the 1st October 2025 to 31 March 2026 This is for the software licences and annual support and maintenance contract provided by Schneider Ltd for the Wales Telemetry System. This support is essential to obtain licence agreements
The pump currently installed at Collister Pill Pumping Station is a Grundfos Sarlin Axial Flow Pump (type: SA 508 7A511Z 134). This type of pumps is obsolete. As such, we offer Grundfos KPL Axial Flow pump as a replacement, which is specifically designed for high flow and low head. We based our selection on the below duty point:
The Geoscience Team have set up a project to review the groundwater level data we hold from across our groundwater monitoring network (130 sites). We have chosen 40 site to look at in more detail using the modelling code the British Geological Survey (BGS) have developed to get a standard groundwater index (SGI). The aim of the
NRW and Gwynedd Council are working together on a project to undertake investigation, design and repair works on Dee Bridge, Bala. The ultimate aim of the project is to hand the asset over to Gwynedd Council. Giving Gwynedd Council oversight and control of the inspection and design stages of this project is essential in ensuring
Service maintenance contract for PerkinElmer instrumentation at NRW laboratory. Analytical instruments manufactured by PerkinElmer can only be repaired and maintained by the manufacturer.
NRW requires legal advice and support in the following areas: A -Works and Projects B – Fisheries C - Flood Defence and Land Drainage D - Navigation and Recreation E - Water Resources F - Nature Conservation G – Forestry H - Marine Licensing I - General and additional work including that arising out of devolution issues includin
Management of Palleg landfill site - leachate management Implementation, Transport and Disposal, Testing and Monitoring Requirements (Leachate), Grading and Testing (Soils) and Site Management.
Award of Gele Tidal Doors Replacement
NRW require a framework that will facilitate the purchase of additional services that have been identified through continual improvement of the service requirements. The framework is required by NRW to ensure continued access to Supervision, Contract Management and Project Management resource to deliver projects and carry out es
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.