National Highways Limited
Buyer information published with procurement notices.
- Published identifier
- Not supplied
- Address
- Annesley, NG15 0DS, England
- First notice
- 9 Jul 2025
- Latest notice
- 22 Oct 2026
Published procurement activity · 388 tenders
Buyer information published with procurement notices.
PDF Framework - M4 J18 Exit Slip EB MP 170.7-169.4 RS SDF
PDF Framework - A36 South Newton NB & SB MP 54.1 - 59.3 RS
Provision of an independent Principal Inspection and condition assessment of the A453 bridge over Network Rail land, including reporting and maintenance recommendations.
Previous research has identified that collisions at junctions represent at least 21% of Killed and Seriously Injured KSI collisions on the Strategic Road Network SRN, and this is likely to be an underestimate1. The previous research did not provide strong recommendations for junction treatments that would reduce KSIs at
The Consultant is to provide resources to support the following; 1. Primary level commercial support for the PMs with design 2. Interim commercial service to support the PM for the 5 Schemes 3. Life Extension Works Schemes commercial support 4. Handover - Transition to strategic partner It is anticipated t
ETC/146 - Edinburgh - Carlisle - Ale Water Viaduct
The need for updates to the Design Manual for Roads and Bridges (DMRB) and Manual of Contract Documents for Highways Works (MCHW) (Instructions for Specifiers (IfS) and Specification for Highway Works (SHW)) has been established from a review carried out by National Highways. The objectives are to: - enhance content, usa
25000 Tonnes Brown Salt Order for the East Region various depots
Diversion of an existing UK Power Networks 3x150EPR 11kV main using 300AI 3c triplex cable to ensure minimum cover depths are maintained across a proposed new construction (bell-mouth BM22) access road.
Diversion of an existing UK Power Networks 11kV electricity cable affected by the BM29 Bell Mouth construction works at Stifford Clays Road. The works include management of the 11kV outage, CDM site setup, excavation and reinstatement of approximately 130m of cable duct route, installation of approximately 130m of 11kV 185Al XLP
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.