HAMPSHIRE COUNTY COUNCIL
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PBHM-7586-PWLP
- Address
- Winchester, UKJ36, SO238UJ, United Kingdom
- First notice
- 22 Jan 2025
- Latest notice
- 16 Oct 2026
Published procurement activity · 342 tenders
Buyer information published with procurement notices.
Hampshire Council is seeking a provider via the Most Suitable Provider process under the Health Care Services (Provider Selection Regime) Regulations 2023 to embed smoking cessation into talking therapies. Description of Service and Initiative: OHID has allocated funding to local authorities in England through the Local Stop Smo
Boiler Replacement including controls & buried gas main.
The scope of the project involves the installation and replacement of new floor mounted, gas fired hot water heaters at a number of school sites (6no) Works shall also include all modifications to pipework, minor asbestos removal, associated equipment, controls, wiring, BWIC.
The scheme comprises the installation of a chemical damp proof, extensive redecoration of corridors as a result of injecting of damp proof course as well as installation of drain channels in front of main entrance and main playfield door.
Removal of pitched roof tiles, battens and felts. Removal of corridor flat roof insulation and asphalt. Asbestos material removals within entire roof space. Installation of new liquid system and insulation for corridor roofs. Installation of new peg tiles, battens and felt. Installation of new guttering.
Pupil toilet refurbishment to include three individual WCs. Replacement of sanitaryware, floor surfaces, installation of hygienic wall cladding and decoration to all rooms. Ventilation to be installed to Rooms 9 & 41.
The proposed scheme comprises internal reconfiguration and refurbishment works to expand and modernise the existing kitchen facilities. The works will include the demolition of selected internal walls to create a larger and more efficient kitchen space, removal of an existing staff kitchenette, associated doors, wall finishes, v
Window and door replacement , existing timber with Aluminium
The structure of the Annual Performance Award (APA) is being changed for 1 year only (1st April 2026 - 31st March 2027) to a linear approach. This will change the APA (which represents 20% of the annual contract value) to commence from 0% payment at the point of the contractual minimum target KPI, increasing linearly to reach 10
The Project comprises of work within the existing main boiler room at The Wavell Secondary School located at Lynchford Road in Farnborough and include the following: Removal of existing boilers c/w flue system, water calorifiers complete with all existing heating pumps, heating, gas and domestic water services pipework and cont
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.