This requirement is for a further programme of four two-day, in-person ExCo leadership workshops delivered by Aspect, following the initial ExCo reset led by them. The original reset established a shared strategic direction, clearer accountability framework and agreed way of operating. The follow-on workshops are required to sus
This notice does not describe a modification of the contract. Instead this notice is being used as an addendum to contract detail notice. This notice has a copy of the redacted contract included, which is a requirement of the Procurement Act. Find a Tender service currently doesn't have the functionality to edit the notices to
Providing strategic planning advice on land use planning matters to GBE-N and its associated organisations. Providing leadership in the development and delivery of all land use planning applications, including TCPAs and project DCOs. Providing leadership in the delivery of post-application planning activities, including but n
Provision of a legal cost management platform and associated managed service to Great British Energy - Nuclear (GBE‑N). The contract includes access to a cloud‑based platform to support the sourcing, management and oversight of external legal services, together with implementation, configuration, support, legal invoice review, b
The Delivery Partner (DP) will be responsible for supporting the development and delivery of the programme, providing technical, commercial and project management capability to ensure effective planning, risk management and delivery of defined outcomes. The estimated value is £1,080,000,000 inclusive of VAT based on the contract
This is a high-level construction advisory brief for BAM Nuttall Ltd to support programme development for the Wylfa enabling works, specifically in relation to bulk earthworks and platform formation. The intention is to obtain practical, buildability-led input to inform early programme durations, sequencing strategies, and oppo
Great British Energy - Nuclear (GBE‑N) awarded a call-off contract under the G‑Cloud 14 Framework Agreement (RM1557.14) for the provision, implementation, configuration, support and maintenance of an Enterprise Risk Management System. The solution provides a cloud-based platform for the capture, assessment, management and report
This work package encompasses the engineering capability to progress the concept design produced by the Foundation Engineer (FENG) at the end of RIBA Stage 2 and to continue the development of the design for site works through RIBA Stages 3 (Spatial Planning) and 4 (Technical Design) throughout the entire lifecycle of the Small
This work package covers key enabling activities required to prepare the site for main construction. It includes early-stage civil works such as site establishment, construction utilities, and supporting infrastructure—such as drainage.Together, these early works provide the foundational physical platform needed to de‑risk, mob
To support delivery of the Small Modular Reactor (SMR) Project in accordance with the overall programme objectives, GBE-N (the Client) is seeking to procure a Delivery Partner (the Consultant) to provide the necessary capabilities, competence, and capacity to provide overall management, coordination and integration of the SMR Pr