Environment Agency
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PNWW-1475-NYLN
- Address
- London, UKI32, SW1P 4DF, United Kingdom
- First notice
- 11 Mar 2025
- Latest notice
- 20 Oct 2026
Published procurement activity · 246 tenders
Buyer information published with procurement notices.
Provision of a robotic system(s) suitable for the trace analysis or semi volatile organic substances including but not limited to of Poly Fluro Alkyl Substances (PFAS) in a range of environmental waters and associated materials. All critical parts of the system must therefore be free of PTFE (Polytetrafluoroethylene) and other P
The primary Audience (training recipients) for both parts will be the Environment Agency’s staff in environment planning, permitting, analysis & reporting, data and evidence teams and WQ regulatory teams (but will be available to other officers where knowledge of statistics is required). It is expected that the audience will di
Crimestoppers Trust Waste Campaign.
Water voles are an IUCN Red List Species, their threat status for the most part, is a result of predation my American mink, an invasive non-native species. The control and eradication of mink through effective regional partnerships t has been identified by Natural England through their Threatened Species Recovery Action (TSRA) p
Land Sea Interface Project: WP3 Regional Research & Assessment OCF will provide overall project management with responsibility for the timeline, reporting to the EA, hosting the national RME Steering Committee, and supporting CPN and TWT to deliver the SEME webinars in 2025-2026.
We need to strengthen and improve grouping asset data across the asset management lifecycle, with a particular focus on how assets are grouped spatially. The AIMS AMP Project has produced draft FCRM Asset Management Plans (AMP) units nationally. Further work is required to secure final sign-off of these units from Area Teams. Th
CDF2 will deliver asset management activities across the whole of the EA's asset base including Flood and Coastal Risk Management, Navigation and Water Land and Biodiversity assets. The Framework will provide appraisal, design, technical support, and construction works that support the EA’s asset management, maintenance, refurbi
NW CCS RM6343 - Estates Management Services 2 - Lot 5. Land Agency Services
Collaborative Agreement to support delivery of recommendations and priority actions from the River Ems 10 Year Restoration Plan across seven sites to enhance the river’s ecological health and build resilience against low flows and future environmental pressures.
The objectives of the Project are to: 25/26 (a) Deliver capital projects which include erosion control to banks to reduce run off and sediment load into the channel (b) Deliver additional bank erosion control work (putting matting on eroding banks by the allotments), marginal planting along the stream, tree thinning along Winter
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.