ENVIRONMENT AGENCY
Buyer information published with procurement notices.
- Published identifier
- GB-PPON PNWW-1475-NYLN
- Address
- London, UKI32, SW1P 4DF, United Kingdom
- First notice
- 11 Mar 2025
- Latest notice
- 22 Oct 2026
Published procurement activity · 250 tenders
Buyer information published with procurement notices.
Procurement of UKCEH1521 Data Licenses for exclusive datasets owned by UKCEH Ltd. Due to this being under the PA2023 procurement threshold and the existing IP owned by the Supplier, this procurement is a below threshold direct award to the Supplier.
Per- and poly-fluoroalkyl substances (PFAS) are a broad group of synthetic fluorinated chemicals which are persistent in the environment. Some are bio-accumulative and toxic, and/or highly mobile. PFAS are used in a wide variety of consumer products and industrial applications because of their unique chemical and physical proper
CDF2 will deliver asset management activities across the whole of the EA's asset base including Flood and Coastal Risk Management, Navigation and Water Land and Biodiversity assets. The framework will provide both appraisal, design, technical support and construction works that support the EA’s asset management, maintenance, ref
The Boston Barrier comprises a group of over 100 individual assets, including a radial gate flood barrier, which between them protect more than 14,000 residential properties and 800 commercial and community buildings. Since being active the barrier and associated assets have been operated and maintained under an NEC Term Service
Inspection of the below water parts of a river flood wall in Tiverton, Devon. Inspection is required on 3 structures and 3 lengths of wall, totalling 600m in length to identify physical defects and identify any areas of scour to the base of the wall. A detailed works summery has been prepared. The findings of the survey are to
The Environment Agency is inviting quotations from experienced consultants to assist in the creation of the EA Cultural Framework. With the introduction of EA2030, the new strategy of the Environment Agency, we need a consultant who can offer essential guidance, support, and strategies to effectively implement our refreshed valu
The Incident Management Forecasting System (IMFS) is the Environment Agency’s primary flood forecasting system and uses Deltares owned Delft-FEWS software as a platform to run models for flood forecasting, groundwater modelling, bathing water quality forecasting, and other services. The National Groundwater Modelling Service (NG
marine vessel services for the Environment Agency (EA) commissioned estuarine and coastal monitoring programme, delivered by the Monitoring Survey Estuarine and Coastal (MSEC) team, part of National Monitoring Survey.
biowaste activities can play a key role in providing energy security for the UK. This is on behalf of the Environment Agency (EA). The EA’s ambition is to provide a programme of training which supports EA officers in their biowaste capability journey. We have formal learning interventions in place, Operational Instructions which
The Authority runs various schemes and research projects which relate to land contamination – identifying and evaluating chemical risks, plus the investigation and remediation of those sites where the risk to health or the wider environment is considered unacceptable.<br/>To help deliver Authority led schemes and initiatives, th
Organisation details and tender classifications reflect information published by the original procurement sources. Similar buyer names are grouped only where an official identifier or compatible name and postcode provide a safe link.